From enquiry to ownership.

Track delivery, compare payment plans, book a visit, tour virtually, and download official materials — all linked from one hub.

01

Construction progress

Transparent delivery.

Monthly progress

Site updates by month.

Select a reporting month to view completion rate, site photography, and the latest drone survey.

Raft pour — Tower One

01

December 2025

Foundation & raft

Raft foundation delivered to specification. Core pit excavation complete. Site logistics and crane base installed.

Overall completion

Drone video

Drone survey — December 2025

Aerial overview of foundation programme and site logistics layout.
Core walls — level 2

02

January 2026

Core structure start

Core walls rising on Tower One. Podium slab formwork underway. MEP coordination sessions completed for lower levels.

Overall completion

Drone video

Drone survey — January 2026

First structural rise visible from aerial perspective.
Tower One — south elevation

03

February 2026

Structure floors 1–4

Tower One structural frame advancing — floors 1–4 cast. Podium slab poured. Landscape preparation begins at podium edge.

Overall completion

Drone video

Drone survey — February 2026

Structural progress and podium context from aerial survey.
Tower One — south elevation Current report

04

March 2026

Structure & MEP rough-in

Tower One current progress — core structure advancing, MEP rough-in underway on lower floors. Façade mock-up review scheduled.

Overall completion

Drone video

Drone survey — March 2026

Monthly aerial survey — full embed available at sales centre.

Progress timeline

Four-year delivery arc.

From masterplan approval to phased handover — each year marks a defined construction milestone.

  1. 2023
    Complete

    Masterplan & permits

    Design development, authority approvals, and contractor mobilisation.

  2. 2024
    Complete

    Groundworks

    Site preparation, piling programme, and enabling works across the plot.

  3. 2025
    Complete

    Foundation & core

    Raft foundation, core construction, and podium structure delivered.

  4. 2026
    In progress

    Structure rising

    Tower superstructure, MEP rough-in, and façade programme in active delivery.

Key milestones

2025 Q4

Foundation complete

Raft and core foundation delivered to specification.

2026 Q1

Structure rising

Tower One structural frame — floors 1–8 cast.

2026 Q2

MEP rough-in

Mechanical and electrical routing on active floors.

2026 Q3

Façade programme

Envelope mock-up approved — cladding sequence begins.

Play latest survey

Drone footage

Aerial site surveys.

Monthly drone captures document vertical progress, site logistics, and the evolving skyline context.

Full-resolution drone reels are available at the sales centre and in the investor brief. Clips below reflect the latest published surveys.

  • March 2026 Structure & podium context
    2:48
  • February 2026 Floors 1–4 cast
    2:31
  • January 2026 Core rise begins
    2:22
  • December 2025 Foundation complete
    2:15
02

Pricing

Structured payment plans.

Payment plans

Choose the rhythm that fits.

Standard

Construction-linked

Featured
20% On booking
30% Structure complete
30% Façade complete
20% On handover

Balanced entry — ideal for end-users.

Investor

Extended schedule

15% On booking
25% Foundation
25% Structure
20% Façade
15% Handover

Lower upfront — suited to portfolio buyers.

Full pay

Single settlement

100% On booking

Maximum discount tier — limited availability.

ROI context

Yield in a rising market.

Basra's residential market shows sustained demand driven by infrastructure investment and limited premium supply. Kabta Towers targets both rental yield and capital appreciation through phased delivery and landmark positioning.

2024 2025 2026 2027 2028
ROI projection GDP growth

Projected figures are indicative — request the investor brief for detailed assumptions.

03

Sales center

Start your journey.

Book your visit

Schedule your appointment.

Choose your preferred date and time — our sales team will confirm with discretion and prepare materials for your visit.

Whether you are exploring a residence, reviewing masterplans, or requesting an investor briefing, we tailor each appointment to your goals.

  • Consultation Private sales meeting
  • Materials Floor plans & masterplan
  • Site option On-site tour available

We respond within one business day — by phone, WhatsApp, or email.

Virtual tour 360°

Walk the towers before you arrive.

Explore lobby, model residences, and amenity spaces in immersive 360° — available online and at the sales centre.

Full Matterport environment — best experienced on desktop. Mobile tour and guided preview available during your visit.

  • Lobby Arrival experience
  • Model unit Sample residence
  • Amenities Pool & club deck
04

Virtual tour

Walk the towers.

Virtual tour

Walk the towers.

Start tour

Kabta Towers — 360° preview

Full Matterport environment embed — best experienced on desktop with headphones. Mobile tour available at the sales centre.

Matterport / Unreal

How to explore

01

Navigate

Click hotspots to move between spaces — lobby, model unit, pool deck.

02

Measure

Use built-in measurement tools to understand room proportions.

03

Visit

Book a private viewing to experience materials and views in person.

Continue exploring

Discover the project or explore resident life.

Book now